Recent projects
-
Rangipo Tunnel Repair
In 2010 MAP Projects was the first contractor to successfully complete the dewatering of the 40m deep, 4. 5m diameter and 3km Rangipo Outfall tunnel in over 30 years. The Project for Genesis Energy and was completed in 8 days as part of a 14 day planned shut...
-
Rail Spiral Upgrade – Pureora Trail
We worked on this project for DOC in 2011 which involved the construction of a stream diversion to divert water from the spiral tunnel and then lining this with rock and geotextile. The rock was sourced from a local quarry and carted to site before being re-handled and placed in its final location. We managed to cart the spoil to an alternative disposal area (further away) which saved approximately 70% of the vegetation and regrowth on the nominated disposal area and thus presented a more natural outlook to bike path users The project involved the placement of two large 1600mm culverts and construction of some 450m of bike paths to underside of surfacing level house design and manufacture of a protection cage over the crew to ensure any rock blocks falling from the roof during drilling would not harm our crews...